Document Controller – Data Centre Construction – Berlin

  • Home
  • Document Controller – Data Centre Construction – Berlin

Document Controller – Data Centre Construction – Berlin

Location: Berlin, Germany Salary: €70,000 - €75,000 + Benefits

Document Controller – Data Centre Construction – Berlin
 

Our client, a global leader in project delivery within the data centre and mission-critical sectors, is expanding its presence in Germany. As part of a major data centre development in Berlin, they are seeking a highly organised and tech-savvy Client-Side Document Controller to join the project team.
 

This role is ideal for a detail-driven professional experienced in managing digital project tools and document workflows on large-scale construction projects. The position offers a choice between a permanent or 12-month contract, with the opportunity to work on a high-profile project at the forefront of Europe’s data infrastructure growth.

Role Responsibilities:

  • Manage and maintain all project documentation using platforms such as BIM 360, SharePoint, ACC, and Aconex
  • Set up and configure document control systems and workflows to support project delivery
  • Ensure consistent document naming, version control, access rights, and archiving protocols
  • Record, track, and distribute meeting minutes, RFIs, submittals, and correspondence
  • Support project team and client stakeholders in using the CDE tools effectively
  • Maintain audit trails and ensure full traceability of project information
  • Collaborate with contractors, consultants, and internal teams to ensure timely and accurate documentation

Candidate Profile:

  • Minimum 3 years’ experience in a Document Controller role on construction or engineering projects
  • Strong working knowledge of BIM 360, SharePoint, Autodesk Construction Cloud (ACC), and/or Aconex
  • Previous experience supporting client-side or Tier 1 construction delivery teams
  • Excellent attention to detail, organisational skills, and understanding of document control best practices
  • Fluent English required; German language skills beneficial
  • Based in or willing to relocate to Berlin, with flexibility to attend on-site meetings when required

What’s on Offer:

  • €70,000 - €75,000 + Benefits
  • High-visibility role within a flagship data centre construction programme
  • Opportunity to work with cutting-edge project tools and technologies
  • Supportive and structured team environment with ongoing career development potential

Disclaimer:

Apply For This Job

Reference: MINLIGGERM1411

Sector: Construction

Type: Permanent

Vision
To consistently deliver a recruitment service that's of an exceptional standard and guided by values of performance, trust, transparency and respect.
Mission
To work in partnership and thoroughly understand the needs and preferences of both our clients and candidates.
Values
Collaborative, passionate, reliable and adaptable - we do not promise what we cannot deliver.